U.S. Department of State | U.S. Department of Defense | Department of Foreign Affairs Canada
International Monetary Fund | The United Nations | The World Bank | Asian Development Bank
bmk Construction Company - Afghanistan
bmk Construction Company - Afghanistan is a licensed, Afghanistan-based construction company that provides consulting engineering and consulting services for similar physical security and mitigation projects, but exclusively within the Afghanistan theater.
Located in the Shar-e-Naw district of Kabul (District 10), bmk Construction Company - Afghanistan is focused on supporting the international community in all provinces of Afghanistan. bmk's client base in Afghanistan has included the Asian Development Bank, the Internaitonal Monetary Fund, the United Nations International Organization for Migration, the United Nations Development Programme, and the Embassy of Canada to name a few.
Expertise
-
In-house Structural Engineering Design
-
Blast Engineering Design
-
Structural Engineering Design
-
Construction Management
-
Construction Services
-
Consulting Services
-
Product Development
Product Development
JFJ remains on the leading edge of physical security design solutions by providing a blend of services that includes product development, design, and application (both specifying and installing products into project settings).
The engineers of JFJ routinely incorporate their physical testing experience of security-related products into specific project applications. During the last 10 years, the engineers of JFJ have assisted product vendors in the development and physical testing.
Representative Work
INTERTEX, PATRIOT BARRIER
The engineers of JFJ conceptualized the deisgn of this K12 active vehicle barrier system, performed the engineering analysis and coordinated the physical testing at KARCO Engineering in Adelanto, CA. The vehicle barrier successfully achieved a K12 rating. Mr. Kenneth Best is a patent holder for this barrier system.
AUTOGATE, THE SHIELD
The engineers of JFJ worked with this product vendor to develop an anti-ram version of their popular vertical pivot lift gate. Finite element analysis was used to design the system prior to physical crash testing at the Transportation Research Center in Ohio. The vehicle barrier successfully achieved a K12 rating.
DELTA SCIENTIFIC, DSC 501
The engineers of JFJ acting on behalf of Naval Facilities Engineering Comman, EFA Chesapeake, worked with the engineers at Delta Scientific in a peer review capacty to develop this shallow-mount active wedge barrier. The DSC 501 set the industry standard for shallow mount vehicle barrier systems. The engineers of JFJ participated in the physical testing at KARCO Engineering in Adelanto, CA. The vehicle barrier successfully achieved a K12 and K54 rating.
RSA Protective Technologies, K4 Bollards
the engineers of JFJ worked with this vendor to develop the industry’s first shallow-mount passive bollard system. The initial design of this system included an installed depth of 14-inches and achieved a physical rating of K4. The system was later refined to minimize the installed depth to just 6.5-inches. The systems were physically tested at The Pennsylvania State University and KARCO Engineering, respectively.
RSA Protective Technologies, K8 Bollards
The engineers of JFJ worked with this vendor to enhance the development of the K4 shallow-mount bollard systems by increasing the physical rating. The initial design of this system included an installed depth of 12-inches and achieved a physical rating of K8. The system was later refined to minimize the installed depth to just 6.5-inches. The systems were both physically tested at KARCO Engineering.
Boeing, Cable Fence Barrier
The engineers of JFJ, working on behalf of Long Fence, developed a cable barrier system for incorporation into their standard chain link fence system. This project requirement was in response to a contract with the Department of Homeland Security for segments of the U.S./Mexico border control initiative. This passive vehicle barrier was designed and successfully tested for a 10,000-lb threat vehicle with a 40-mph impact speed. The physical testing was performed at Texas Transportation Institute.
Corrugated Metals, The Metalith
The engineers of JFJ worked with this product vendor to perform an anti-ram test of their blast mitigation wall system. The wall system, which incorporates metal wall panels and earth fill, was successfully tested physically tested for both a K12 and K50 rating.
Construction Expertise
U.S. Embassies Worldwide 1993 - present
Structural and Physical Security Engineering
Worldwide
FE/BR Door and Window Replacement 2014 - 2015
U.S. Embassy Dar Es Salaam – USAID and MSGQ
U.S. Department of State
Office of Overseas Building Operations 2013 - 2014
U.S. Embassy Iraq – Baghdad Major Rehabilitation
Baghdad, Iraq
U.S. Department of State
Office of Overseas Building Operations 2013
U.S. Consulate Basrah – Security Upgrades at
Tactical Operations Center
Basrah, Iraq
U.S. Department of State
Office of Overseas Building Operations 2012 - 2013
U.S. Embassy Iraq – Baghdad Major Rehabilitation
Baghdad, Iraq
Canadian Embassies Worldwide 2008 - 2012
Design-Build Window Upgrades for Department of
Foreign Affairs & International Trade Worldwide
Window Security Upgrades 2010 - 2012
Embassy of Canada to Colombia
Window Security Upgrades 2009
Embassy of Canada to Thailand
Window Security Upgrades 2009
Embassy of Canada to Philippines
Window Security Upgrades 2008 - 2009
Embassy of Canada to Sri Lanka
Window Security Upgrades 2008
Embassy of Canada to Afghanistan
Blast Vulnerability Assessment &
Window Security Upgrades 2004
International Monetary Fund
Afghanistan Country Office
Forensic Structural Assessments 2007 - 2008
Air Force Center for Engineering and the Environment
U.S. Embassies Worldwide
Design-Build IDIQ 2004 - present
Worldwide Forced Entry/Ballistic Resistant Door &
Window Replacement and Repair Contract
Worldwide
U.S. Embassies Worldwide
Design-Build IDIQ 1999 - 2001
Worldwide Perimeter Security Upgrade (PSU) Contract
Worldwide
Perimeter Security Upgrade, FE/BR Replacement &
Blast Hardening 2001 and 2013
U.S. Embassy Dar Es Salaam – USAID and MSGQ